Call us: 0116 2813200

Our Work - Multi-sport

Synthetic Grass Sprint Track Construction

Tillington Resource Centre

Staffordshire

Dura-Sport were appointed to supply and install Champion 24 sand filled synthetic grass over a Durapad shock absorbing performance layer to create a four lane sprint track at Tillington Resource Centre in Staffordshire. 

A contrasting polymeric surface was then installed around the perimeter. 

Type:
Synthetic Grass Sprint Track Construction
Surfacing:
Champion 24 Sand Filled Synthetic Grass

You may also be interested in:

The Coppice Primary School

Synthetic Grass MUGA Installation

Full Details

Loreto College

Triple Jump / Long Jump Track Refurbishment

Full Details

David Hughes Leisure Centre

Synthetic Grass MUGA Resurfacing

Full Details






Join Our Mailing List

When you sign up to our mailing list we will store your email address securely and contact you with relevant updates in the future (we never share your details). For more information please see our privacy policy.

© 2026 Dura-Sport Ltd. Web design by Adventure