Call us: 0116 2813200

Our Work - Cricket

Twin Bay Non Turf Cricket Practice Facility Construction

Belhus Cricket Club

Grays, Essex

Belhus Cricket Club is based on North Stifford Village Green in Essex. A very traditional cricket ground in the heart of the community. The natural turf square and outfield is immaculately kept and prepared by a dedicated grounds team, winning Essex League’s “Best Pitch” awards. 

However the same praise could not be heaped on their existing nets. Despite being repaired and tidied over the years, they were by the clubs own admission not up to the standards that the club strive for in terms of their “endeavour to provide first rate facilities that will enable young players to fulfil their potential” a comment found on the club website. 

Dura-Sport were approached by the club to provide such a facility. Numerous layouts were discussed and examined before the final design was agreed, following the exact specification we had recently constructed within an International Test Venue. 

The facility design was extended in length to 40.00m to allow additional run up and small sided games, but also in width to provide a wider footprint in order for a fencing system to be fitted retrospectively. 

The first phase of the project was to knock down the existing 24m long facility, rip out the tired and worn batting and bowling carpets and remove materials from site. 

The new extended facility was then set out and works began excavating out the area and importing our new specialist materials to form the facility foundation. 

The club opted for the full length pitch configuration incorporating The ECB Approved DSi-pro Vision cricket pitch system, the closest non-turf pitch in the industry in both performance and appearance to a well prepared natural turf wicket, due to its loam coloured DSi-weave playing surface with spike resistant technology. 

A taller, thicker cage structure was then erected and fitted with our new enhanced netting system and DS Evograss tri-coloured synthetic grass was installed within the run up area, again with the aim of replicating a natural turf scenario and providing an area for small sided games. 

The project was completed ahead of schedule and within budget. 

 

Type:
Twin Bay Non Turf Cricket Practice Facility Construction
Surfacing:
The ECB Approved DSi-pro Vision Cricket System and DSi-weave Cricket Carpet

What the client said:

“We appointed Dura-Sport on recommendation and had an excellent experience during our build. Dura-Sport were aware that we were up against a tight timescale to complete as we had a camp booked which would have fallen through had we not got the nets up. Dura-Sport stuck by their word and everything was delivered on time and within budget. In fact, if the weather had stayed fairer throughout then the team would have been finished a day early. We have nothing but praise for the workmanship and professionalism of Dura-Sport and would thoroughly recommend them to anybody looking to carry out a non-turf project. Cheers guys!”

Scott Sinfield, Belhus Cricket Club

You may also be interested in:

Rugby Cricket Club

New Build Non-Turf Cricket Pitch Construction

Full Details

Syston Town Cricket Club

Twin Bay Non Turf Cricket Practice Facility & NTP Construction

Full Details

Newcastle Cricket Club

New Build Triple Bay Non Turf Cricket Practice Facility Construction

Full Details






Join Our Mailing List

When you sign up to our mailing list we will store your email address securely and contact you with relevant updates in the future (we never share your details). For more information please see our privacy policy.

© 2026 Dura-Sport Ltd. Web design by Adventure